Air Tightness Testing (Part L) in London and the UK

Air tightness testing measures how much air leaks out of a building, expressed as air permeability. Most new dwellings must pass an air test under Building Regulations Part L before building control will sign them off. Fresheco Environmental arranges testing through accredited testers and helps you prepare so the building passes first time.

Air testing services

  • Pre-completion air tightness tests for new houses and flats
  • Commercial and mixed-use buildings
  • Pre-test site checks to find leakage paths early
  • Advice and re-tests if a unit fails

How to prepare for an air tightness test

  • External doors and windows fitted and closed
  • Service penetrations (pipes, cables, ducts) sealed
  • Drainage traps filled with water
  • Building fabric, ceilings and loft hatches complete
  • Mechanical ventilation grilles accessible for temporary sealing

Air tightness testing FAQs

What is an air tightness test?

It is a test where a fan pressurises the building and measures how much air escapes, to check the result meets the design air permeability.

Does every new home need an air test?

Under Part L, new dwellings generally need to be tested before completion. Your SAP assessor or building control body will confirm the requirement for your site.

How long does an air test take?

Testing a typical home takes about an hour once the building is prepared.

What happens if the building fails?

The tester identifies the leakage points, the contractor seals them, and the building is re-tested.

Book an air test

Call 020 3828 0678, email mail@freshecoenvironmental.co.uk or send us your project details. We usually reply with a quote within one working day.

Related services: Energy Performance Certificates · Sound insulation testing · Noise assessments

Fresheco Environmental Ltd · 3rd Floor, 86-90 Paul Street, London EC2A 4NE · Serving London and the whole of the UK.